the byline, dates and any bracketed figures in this guide are sample values.
What a complete kit costs in 2026
These are equipment prices for our ten catalogue kits — panels, inverter, racking, wiring, disconnects, monitoring and documentation in one crate. They are not installed prices, and they are not quotes for a custom roof.
| Kit | Size | Kit price | Price per watt | Monthly estimate* | Est. year one |
|---|---|---|---|---|---|
| 3kW Starter | 3kW | $8,999 | $3.00 | $104/mo | 4,200 kWh |
| 5kW Basic | 5kW | $12,499 | $2.50 | $145/mo | 7,000 kWh |
| 7kW Standard | 7kW | $15,999 | $2.29 | $186/mo | 9,800 kWh |
| 8kW Complete | 8kW | $18,499 | $2.31 | $215/mo | 11,200 kWh |
| 10kW Premium | 10kW | $22,999 | $2.30 | $267/mo | 14,000 kWh |
| 12kW Whole Home | 12kW | $26,999 | $2.25 | $313/mo | 16,800 kWh |
| 10kW Off-Grid | 10kW | $29,999 | $3.00 | $348/mo | 14,000 kWh |
| 15kW Luxury | 15kW | $38,999 | $2.60 | $453/mo | 21,000 kWh |
| 20kW Commercial | 20kW | $42,999 | $2.15 | $499/mo | 28,000 kWh |
The useful comparison is price per watt, not the total. A 12kW kit at $2.25/W is better value per watt than a 5kW kit at $2.50/W — but only if you need 12kW of production. Buying output you cannot use is not a saving.
What the price includes — and what it does not
Included
- Solar panels, an inverter matched to the array, and engineered racking
- MC4 connectors, DC and AC wiring, disconnects and rapid shutdown where required
- Production monitoring and a permit/interconnection document pack
- The manufacturer's written performance and product warranties for the exact models quoted; workmanship is the installer's responsibility
Not included
- Installation labour. A licensed installer typically charges separately; the figure depends on roof height, access and your state.
- Permits and interconnection fees. Set by your city and utility, usually a few hundred dollars.
- Main panel upgrade if your service is 100A and the array needs 200A. Confirm this before ordering.
- Freight and import costs — quoted by postcode; duties, tariffs and brokerage are itemized where they apply.
- Structural work — a roof that needs repair or reinforcement first.
The $/W ranges and state table below are 2026 estimates. Your actual installed cost depends on labour, permits, your utility and local incentive programs.
Cost per watt, by system size
Price per watt falls as the system grows, because the inverter, racking and paperwork are shared across more panels. Below is the same catalogue in $/W terms.
| System | Kit price | Price per watt | Typical household |
|---|---|---|---|
| 3kW | $8,999 | $3.00 | 1–2 people, 300–500 kWh/month |
| 5kW | $12,499 | $2.50 | 2–3 people, 600–900 kWh/month |
| 7kW | $15,999 | $2.29 | Average home, 800–1,100 kWh/month |
| 8kW | $18,499 | $2.31 | Larger home, 900–1,200 kWh/month |
| 10kW | $22,999 | $2.30 | Large home, 1,100–1,500 kWh/month |
| 12kW | $26,999 | $2.25 | Pool, EVs, 1,300–1,800 kWh/month |
| 15kW | $38,999 | $2.60 | All-electric home with 27kWh storage |
| 20kW | $42,999 | $2.15 | Small commercial, three-phase |
What installation adds
Installation is the largest line that is not in a kit price. It covers labour, mounting, electrical work, permitting and inspection. Rather than quote a national percentage — those averages hide huge regional differences — get three local quotes for the same bill of materials and compare the labour line separately.
When comparing an installed quote against a kit, add these to the kit price: installation labour, permit fees, shipping, any panel upgrade, and the cost of your own time if you general-contract the job. Only then compare totals.
Incentives in 2026
The federal residential solar credit (Section 25D) ended for systems completed after December 31, 2025. That changed the maths for homeowners: there is no longer a blanket 30% federal credit to subtract from a residential quote.
What remains is local. State tax credits, utility rebates, property-tax exemptions and net-metering or net-billing rules vary by address and change annually. Before you sign, ask three questions:
- Is this incentive a tax credit, a rebate, or a bill credit — and when do I actually receive it?
- Does it require a specific equipment list, installer certification or efficiency threshold?
- Does my utility still credit exported power at the retail rate, and for how many years?
Our financing and incentives page tracks what we can verify. It is a starting point, not tax advice.
Cost by state
Equipment prices are national. Installed costs are not: labour rates, permit fees and utility rules differ enough that the same kit can land 40% apart. Fill this table with your own quoted projects.
| State | Typical installed $/W | Typical 8kW installed | Local incentive to check |
|---|---|---|---|
| [State 1] | $[REPLACE] | $[REPLACE] | [REPLACE — local incentive] |
| [State 2] | $[REPLACE] | $[REPLACE] | [REPLACE — local incentive] |
| [State 3] | $[REPLACE] | $[REPLACE] | [REPLACE — local incentive] |
| [State 4] | $[REPLACE] | $[REPLACE] | [REPLACE — local incentive] |
| [State 5] | $[REPLACE] | $[REPLACE] | [REPLACE — local incentive] |
How to compare three quotes without being misled
- Normalise the size. Compare price per watt at the same annual production, not the same panel count.
- Check the inverter. A hybrid inverter costs more than a string inverter and changes what the system can do later.
- Ask what is excluded. Permits, panel upgrade, trenching, shipping and monitoring subscriptions are the usual omissions.
- Read the warranty holder. A 25-year promise from a company that will not exist in five years is not worth much. Ask who pays the labour on a claim.
- Get the production estimate in writing — and the assumptions behind it: tilt, azimuth, shade, degradation.
The bottom line
In 2026, a sensible residential kit costs roughly $2.15–$3.00 per watt before installation. The number that decides your payback is not the sticker price but your own kWh usage and what your utility pays for exported power. Size to your usage, add storage only if you value backup, and treat any savings figure without assumptions as marketing.
Questions we get about this
Usually on equipment, but not always overall. A kit removes the installer’s margin on hardware; you still pay for labour, permits and shipping. Compare total installed cost per watt for the same production.
The residential Section 25D credit ended for systems placed in service after December 31, 2025. Business and commercial projects may still qualify under different rules. Confirm with a tax professional before relying on any credit.
Fixed costs — inverter, racking design, disconnects, documentation — are spread over fewer watts. A 3kW kit will always cost more per watt than a 12kW kit.
Financing preserves cash but adds interest; the monthly figure is not the price. Compare the total of payments against the cash price, and check whether the lender charges dealer fees that inflate the principal.